📊 Production Analytics
Output, efficiency, and performance metrics across all production lines
Avg Efficiency
79.3%
Avg Scrap Rate
2.41%
Total Downtime
30.2h
On-Time Delivery
90.6%
Daily Output (Units)
Mon
420/450
Tue
435/450
Wed
410/450
Thu
445/450
Fri
385/450
Actual
Planned
Downtime Analysis by Cause
Equipment Breakdown
42h (28%)
Planned Maintenance
38h (25%)
Material Shortage
32h (21%)
Setup & Changeover
24h (16%)
Quality Issues
15h (10%)
Line Performance - Efficiency %
Weld Line 1
85.0%
Weld Line 2
72.0%
CNC Bay
92.0%
Assembly 1
68.0%
Assembly 2
78.0%
Paint/Finish
65.0%
Pack/Ship
95.0%