Equipment Log
?

Equipment Log & Maintenance History

Equipment Overview

Injection Molding Machine A-1

Injection MoldingEngelInstalled 2018-06
Good
Runtime Hours
24,500
Maintenance Hours
1,840
Failure Count
3
MTBF (hours)
8,167
Last Service
Mar 15

CNC Lathe B-3

CNC MachiningHaasInstalled 2020-03
Excellent
Runtime Hours
18,300
Maintenance Hours
1,200
Failure Count
1
MTBF (hours)
18,300
Last Service
Mar 13

Assembly Conveyor C-2

ConveyorFlexLinkInstalled 2019-11
Fair
Runtime Hours
32,800
Maintenance Hours
960
Failure Count
5
MTBF (hours)
6,560
Last Service
Mar 10

Hydraulic Press D-1

Hydraulic PressBeckwoodInstalled 2017-01
Good
Runtime Hours
28,900
Maintenance Hours
2,100
Failure Count
2
MTBF (hours)
14,450
Last Service
Mar 15

Welding Robot Arm E-2

Robotic WeldingABBInstalled 2021-05
Good
Runtime Hours
12,500
Maintenance Hours
840
Failure Count
1
MTBF (hours)
12,500
Last Service
Mar 8

Oven Furnace F-1

Heat TreatmentThermalInstalled 2016-09
Fair
Runtime Hours
38,200
Maintenance Hours
1,600
Failure Count
6
MTBF (hours)
6,367
Last Service
Dec 30

Recent Maintenance Activity

Hydraulic Press D-1
Oil change, filter replacement
PM1.5h
Mar 15
CNC Lathe B-3
Coolant system flush
PM2h
Mar 13
Assembly Conveyor C-2
Belt tension check
PM1h
Mar 10
Welding Robot Arm E-2
Gripper repair
Emergency3h
Mar 8
Injection Molding Machine A-1
Pressure gauge replacement
Repair2.5h
Mar 5